| 132KV KANWAN | 111 | D6 | DHAR | 33KV BORALI | I | ON | 09 Jun 26 | 10:17:13 | 4.02 | 31 Mar 26 | 19:36:13 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV BIDWAL | I | ON | 09 Jun 26 | 10:17:13 | 3.432 | 01 Jun 26 | 21:09:12 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV CHAYAN | I | ON | 09 Jun 26 | 10:17:15 | 7.473 | 17 May 26 | 07:13:14 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV RAJOD | I | ON | 09 Jun 26 | 10:17:16 | 4.362 | 25 May 26 | 14:45:15 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV KAROLI | I | ON | 09 Jun 26 | 10:13:12 | 12.326 | 06 Jun 26 | 13:47:13 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV TONKI | I | ON | 09 Jun 26 | 10:13:21 | 6.9405 | 03 Apr 26 | 11:25:21 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV DATTIGAON | I | ON | 06 Apr 26 | 10:56:14 | 0 | 08 Nov 25 | 17:00:14 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV RAJOD | I | ON | 06 Apr 26 | 10:56:15 | 0 | 20 Oct 25 | 17:45:15 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV DASAI | I | ON | 06 Apr 26 | 10:56:16 | 0 | 09 Nov 25 | 08:13:16 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV SEJWOYA | I | ON | 07 Jun 26 | 08:30:14 | 0 | 03 Jun 26 | 07:48:14 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV KUNJROD | II | ON | 08 Jun 26 | 14:01:15 | 0 | 12 Dec 25 | 15:28:13 | 0 |
| 132KV BARWANI | 110 | D6 | DHAR | 33KV NISARPUR | II | ON | 09 Jun 26 | 09:56:12 | 0.84 | 30 May 26 | 21:15:13 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV GUJARI | II | ON | 09 Jun 26 | 10:24:15 | 2.724 | 30 May 26 | 09:20:15 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV BAKANER | II | ON | 09 Jun 26 | 10:13:15 | 6.8598 | 11 May 26 | 15:25:15 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV DHARAMPURI | II | OFF | 09 Jun 26 | 10:13:17 | 0.0004 | 08 Oct 25 | 22:08:17 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV UMARBAN | II | ON | 09 Jun 26 | 10:13:18 | 4.7984 | 11 May 26 | 15:25:17 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV AMZERA | II | OFF | 06 Apr 26 | 10:56:13 | 0 | 22 Jan 26 | 11:13:12 | 0 |
| 220KV BADNAGAR | 56 | D6 | DHAR | 33KV MULTHAN | II | ON | 09 Jun 26 | 10:18:14 | 1.38 | 24 May 26 | 11:40:12 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV NARAYANPURA | II | ON | 07 Jun 26 | 08:30:12 | 0 | 30 May 26 | 14:38:13 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV BHAWARIYA | II | ON | 09 Jun 26 | 10:19:06 | 12.2826 | 08 Jun 26 | 14:32:06 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV NAGDA | III | ON | 09 Jun 26 | 10:17:15 | 1.596 | 30 May 26 | 09:24:15 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV SINGHANA | III | ON | 09 Jun 26 | 10:13:13 | 0.0136 | 08 Apr 26 | 08:01:14 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV LOHARI | III | ON | 09 Jun 26 | 10:04:06 | 7.8802 | 02 Jun 26 | 13:48:06 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV TEESGAON | III | ON | 07 Jun 26 | 08:30:13 | 0 | 14 Mar 26 | 12:00:14 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV BERCHA | III | ON | 07 Jun 26 | 08:30:14 | 0 | 24 Apr 26 | 19:01:14 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV KALIKADEVI | III | ON | 07 Jun 26 | 08:30:15 | 0 | 03 Jun 26 | 07:48:15 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV RINGNOD | III | ON | 02 Jan 26 | 11:55:14 | 0 | 30 Dec 25 | 13:46:14 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV BAGDI | IV | ON | 08 Jun 26 | 14:01:15 | 0 | 02 Apr 26 | 10:02:14 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV MANDU | IV | ON | 08 Jun 26 | 14:01:14 | 0 | 02 Apr 26 | 17:06:12 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV NALCHHA | IV | ON | 08 Jun 26 | 14:01:14 | 0 | 20 Apr 26 | 11:30:15 | 0 |
| 132KV CHHOTIKHARGONE | 116 | D6 | DHAR | 33KV SUNDREL | IV | OFF | 09 Jun 26 | 10:00:14 | 0.0003 | 30 Apr 25 | 15:44:14 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV KESUR-I | IV | ON | 09 Jun 26 | 10:04:13 | 5.7266 | 01 Jun 26 | 16:15:16 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV KESUR-II | IV | ON | 09 Jun 26 | 10:04:14 | 1.668 | 07 Jun 26 | 17:45:15 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV NEKPUR | IV | ON | 09 Jun 26 | 10:04:14 | 1.392 | 28 Mar 26 | 16:14:14 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV PANKHEDI | IV | ON | 09 Jun 26 | 10:04:15 | 4.7024 | 26 Apr 26 | 15:28:15 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV KAROD | IV | ON | 09 Jun 26 | 10:17:14 | 3.588 | 31 May 26 | 09:35:13 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV AJANDA | IV | ON | 09 Jun 26 | 10:13:14 | 3.7643 | 12 Apr 26 | 07:38:17 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV SINGHANA | IV | ON | 09 Jun 26 | 10:04:04 | 17.0835 | 31 May 26 | 03:10:03 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV JHAPDI | IV | OFF | 09 Jun 26 | 10:04:05 | 0.0002 | 16 May 26 | 09:52:04 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV AHOO | IV | ON | 07 Jun 26 | 08:30:15 | 0 | 30 May 26 | 14:43:24 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV DEDLA | IV | ON | 07 Jun 26 | 08:30:12 | 0 | 06 Jun 26 | 16:32:13 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV TAKRAWDA | IV | ON | 09 Jun 26 | 10:11:10 | 2.6732 | 08 Jun 26 | 10:26:04 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV BAGH | IV | ON | 09 Jun 26 | 10:19:03 | 7.9916 | 09 Jun 26 | 00:08:02 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV DEHRI | IV | ON | 09 Jun 26 | 10:19:04 | 6.5501 | 07 Jun 26 | 18:25:03 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV DHOLIYA | IV | ON | 09 Jun 26 | 10:19:08 | 11.8178 | 09 Jun 26 | 08:48:08 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV NISARPUR | IV | OFF | 09 Jun 26 | 10:19:09 | 0 | 05 Mar 26 | 18:10:10 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV TANDA | IV | ON | 02 Jan 26 | 11:55:15 | 0 | 09 Dec 25 | 10:54:18 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV HATOD | IV | ON | 02 Jan 26 | 11:55:13 | 0 | 30 Dec 25 | 14:22:14 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV DHAMNOD | V | ON | 09 Jun 26 | 10:24:13 | 6.8087 | 30 May 26 | 09:31:13 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV MANAWAR | V | ON | 09 Jun 26 | 10:13:20 | 4.2419 | 03 Jun 26 | 12:50:19 | 0 |
| 220KV BADNAGAR | 56 | D6 | DHAR | 33KV BADNAWAR | V-A | ON | 09 Jun 26 | 10:18:14 | 2.64 | 31 May 26 | 14:19:12 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV SUSARI | VI | ON | 09 Jun 26 | 10:19:10 | 11.0411 | 06 Jun 26 | 18:23:11 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV JEERABAD | VI-A | ON | 09 Jun 26 | 10:13:16 | 2.5433 | 01 Jun 26 | 17:25:16 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV DAHI | VI-A | ON | 09 Jun 26 | 10:19:07 | 7.0265 | 08 Jun 26 | 18:30:07 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV COSMOS LUNAWAT | VI-A | ON | 09 Jun 26 | 10:04:21 | 6.135 | 07 Jun 26 | 09:15:21 | 0 |
| 132KV KANWAN | 111 | D6 | DHAR | 33KV OASIS | VII | ON | 09 Jun 26 | 10:17:14 | 0.168 | 01 Jun 26 | 16:30:17 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV KUNWARSI | VII | ON | 09 Jun 26 | 10:13:03 | 3.3754 | 31 May 26 | 15:49:04 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV KHANDWA KHEDA | VII | ON | 09 Jun 26 | 10:13:04 | 6.421 | 04 Jun 26 | 23:05:04 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV DHAR | VII | ON | 07 Jun 26 | 08:30:13 | 0 | 02 Apr 26 | 19:51:14 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV DASHARA MAIDAN | VII | ON | 07 Jun 26 | 08:30:16 | 0 | 03 Apr 26 | 16:27:18 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SAGORE | VII | ON | 09 Jun 26 | 10:13:18 | 0.252 | 09 Jun 26 | 06:12:19 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV D.C.L. | VII-A | ON | 09 Jun 26 | 10:13:19 | 2.6714 | 05 May 26 | 10:10:19 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV P.H.E. | VII-A | ON | 06 Apr 26 | 10:56:14 | 0 | 06 Nov 25 | 06:50:13 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV BARKHEDA | VII-A | OFF | 09 Jun 26 | 10:04:08 | 0.0006 | 25 May 26 | 10:34:07 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV P.H.E. | VII-A | ON | 09 Jun 26 | 10:19:10 | 3.5879 | 07 Jun 26 | 23:24:11 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV WATER WORKS | VII-A | ON | 09 Jun 26 | 10:19:05 | 0.2434 | 31 May 26 | 07:42:04 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV SAGORE | VII-A | ON | 09 Jun 26 | 10:04:16 | 1.908 | 05 Jun 26 | 06:13:16 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV L.T.INDUSTRIES | VII-A | ON | 09 Jun 26 | 10:13:18 | 8.508 | 06 Jun 26 | 22:07:18 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV P.G.C.I.L. | VII-A | ON | 02 Jan 26 | 11:55:16 | 0 | 26 Oct 25 | 14:25:19 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV BPCL | wIX | ON | 09 Jun 26 | 10:24:14 | 0.746 | 31 May 26 | 05:29:13 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV INDUSTRIAL | wIX | ON | 09 Jun 26 | 10:24:16 | 7.3285 | 17 May 26 | 20:40:15 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV INDUSTRIAL | wIX | ON | 09 Jun 26 | 10:04:13 | 7.812 | 01 Jun 26 | 16:15:15 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV INDUSTRIAL | wIX | ON | 06 Apr 26 | 10:56:13 | 0 | 05 Dec 25 | 11:06:12 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV INDUSTRIAL | wIX | OFF | 07 Jun 26 | 08:30:16 | 0 | 07 Jun 26 | 08:09:17 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV IHB INDRAWAL | wIX | ON | 09 Jun 26 | 10:11:11 | 0.0562 | 05 Jun 26 | 09:32:07 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV KRITI INDUS. | wIX | ON | 09 Jun 26 | 10:04:18 | 3.9527 | 01 Jun 26 | 16:51:17 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SEZ-I | wIX | ON | 09 Jun 26 | 10:13:16 | 10.03 | 05 Jun 26 | 19:52:18 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SEZ-II | wIX | ON | 09 Jun 26 | 10:13:17 | 5.816 | 05 Jun 26 | 19:52:18 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV MITTAL CORP2 | wIX | ON | 09 Jun 26 | 10:13:17 | 9.204 | 05 Jun 26 | 09:01:19 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SEZ-III | wIX | OFF | 09 Jun 26 | 10:13:15 | 0 | 11 Dec 24 | 14:15:15 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV AARTI INDUSTRY | wIX | ON | 09 Jun 26 | 10:13:22 | 2.5967 | 05 Jun 26 | 06:32:24 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV NATIONAL STEEL | X | ON | 09 Jun 26 | 10:04:12 | 6.9 | 22 Sep 25 | 09:14:15 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV MSP | X | ON | 09 Jun 26 | 10:04:12 | 3.588 | 06 Jun 26 | 23:15:13 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV RATHI STEEL | X | ON | 09 Jun 26 | 10:13:20 | 5.22 | 02 Jun 26 | 15:47:22 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV INDUSTRIAL-I | XIII | ON | 08 Jun 26 | 14:01:17 | 0 | 06 May 26 | 10:34:17 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV INDUSTRIAL-II | XIII | ON | 08 Jun 26 | 14:01:18 | 0 | 21 Sep 25 | 15:44:21 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV KINETIC HONDA | XIII | ON | 09 Jun 26 | 10:04:16 | 12.492 | 31 May 26 | 22:03:15 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV NICHOLAS | XIII | ON | 09 Jun 26 | 10:04:19 | 10.8711 | 07 Jun 26 | 16:54:19 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV RAJSHREE | XIII | ON | 09 Jun 26 | 10:04:20 | 9.8075 | 07 Jun 26 | 10:38:20 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV BAJAJ TEMPO | XIII | ON | 09 Jun 26 | 10:04:13 | 12.1525 | 06 Jun 26 | 16:46:13 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV PRESTIGE METAL | XIII | ON | 09 Jun 26 | 10:04:13 | 9.478 | 02 Jun 26 | 15:56:12 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV EICHER | XIII | ON | 09 Jun 26 | 10:04:14 | 11.617 | 07 Jun 26 | 13:17:14 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV L.T.INDUSTRIES | XIII | ON | 09 Jun 26 | 10:04:15 | 14.616 | 01 Jun 26 | 20:02:15 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV RAJRATAN | XIII | ON | 09 Jun 26 | 10:04:15 | 3.936 | 05 Jun 26 | 15:16:31 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV METALMAN-I | XIII | ON | 09 Jun 26 | 10:13:12 | 9.667 | 02 Jun 26 | 15:57:13 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV METALMAN-II | XIII | ON | 09 Jun 26 | 10:13:12 | 11.796 | 07 Jun 26 | 10:01:13 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV GIRNAR | XIII | ON | 09 Jun 26 | 10:13:13 | 7.54 | 07 Jun 26 | 18:15:14 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV CHIRAG | XIII | ON | 09 Jun 26 | 10:13:13 | 5.748 | 08 Jun 26 | 09:31:13 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV NOVINO | XIII | ON | 09 Jun 26 | 10:13:14 | 16.6232 | 02 Jun 26 | 16:50:15 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV PRATIBHA | XIII | ON | 09 Jun 26 | 10:13:14 | 4.92 | 05 Jun 26 | 06:34:14 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SRF | XIII | ON | 09 Jun 26 | 10:13:21 | 8.0325 | 08 Jun 26 | 19:36:22 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV SHIVANGI | XIII | ON | 09 Jun 26 | 10:13:22 | 10.0975 | 05 Jun 26 | 06:32:23 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV AKVN-I | XIII | ON | 09 Jun 26 | 10:13:24 | 10.5109 | 05 Jun 26 | 07:58:27 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV AKVN-II | XIII | ON | 09 Jun 26 | 10:13:25 | 11.7254 | 06 Jun 26 | 13:10:25 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 08 Jun 26 | 14:01:16 | 0 | 07 Apr 26 | 11:45:14 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV HEADQUARTER | zUG | ON | 09 Jun 26 | 10:14:03 | 4.6425 | 03 Apr 26 | 13:30:03 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV HANUMANTIYA | zUG | ON | 09 Jun 26 | 10:14:04 | 6.0837 | 04 Jan 26 | 05:02:04 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV NANDLAI | zUG | ON | 09 Jun 26 | 10:14:05 | 3.959 | 06 Jun 26 | 18:50:06 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:14:06 | 0.0001 | 25 Sep 25 | 10:41:05 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV TILGARA | zUG | ON | 09 Jun 26 | 10:14:07 | 5.832 | 14 May 26 | 19:43:06 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV N.V.D.A. | zUG | ON | 09 Jun 26 | 10:24:16 | 4.32 | 01 Jun 26 | 18:11:16 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:24:17 | 0 | 19 Sep 25 | 12:57:16 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 09 Jun 26 | 10:04:16 | 0 | 29 Mar 26 | 10:30:16 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 132KV ULTRATECH | zUG | ON | 09 Jun 26 | 10:13:23 | 14.9405 | 11 Sep 25 | 08:12:54 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV SATGURU CEMENTS | zUG | ON | 09 Jun 26 | 10:13:24 | 7.6217 | 20 Sep 25 | 09:43:33 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:13:22 | 0.0004 | 18 Aug 25 | 19:57:22 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:13:05 | 0.0002 | 13 Mar 25 | 21:14:04 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV S.I.P.-I | zUG | ON | 09 Jun 26 | 10:13:06 | 13.2928 | 24 May 26 | 16:06:06 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV S.I.P.-II | zUG | ON | 09 Jun 26 | 10:13:07 | 9.4013 | 28 Apr 26 | 13:53:09 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BOLA | zUG | ON | 06 Apr 26 | 10:56:18 | 0 | 27 Oct 25 | 18:15:18 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BHANGARH | zUG | ON | 06 Apr 26 | 10:56:19 | 0 | 13 Dec 25 | 07:40:18 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 06 Apr 26 | 10:56:17 | 0 | 13 Dec 25 | 10:34:17 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV GANDHWANI | zUG | ON | 09 Jun 26 | 10:04:06 | 8.5337 | 31 May 26 | 04:05:06 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 09 Jun 26 | 10:04:07 | 8.8029 | 31 May 26 | 13:03:06 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:14:05 | 0.0004 | 12 Dec 25 | 13:55:06 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV BERCHHA | zUG | ON | 09 Jun 26 | 10:14:04 | 2.9054 | 01 Jun 26 | 16:18:06 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV TEESGAON | zUG | ON | 09 Jun 26 | 10:14:03 | 5.4532 | 25 May 26 | 06:17:02 | 0 |
| 220KV BADNAGAR | 56 | D6 | DHAR | 33KV KACHHIBARODA | zUG | ON | 09 Jun 26 | 10:18:26 | 0.658 | 20 May 26 | 18:00:27 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 132KV VACMET | zUG | ON | 07 Jun 26 | 08:29:21 | 0 | 15 Sep 25 | 02:47:21 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 132KV B/C VACMET | zUG | OFF | 07 Jun 26 | 08:30:20 | 0 | 20 Jun 22 | 15:04:22 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV BHOJ ASPATAL | zUG | ON | 07 Jun 26 | 08:30:21 | 0 | 03 Nov 25 | 11:57:22 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV NEW BUS COUPLER | zUG | OFF | 07 Jun 26 | 08:30:17 | 0 | 05 Apr 26 | 12:42:18 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 07 Jun 26 | 08:30:18 | 0 | 24 Apr 26 | 08:29:18 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV TIRLA | zUG | ON | 07 Jun 26 | 08:30:19 | 0 | 05 Jun 26 | 09:14:23 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV NAGDA | zUG | ON | 09 Jun 26 | 10:11:08 | 5.3555 | 05 Jun 26 | 09:05:04 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV TRANSFER BAY | zUG | OFF | 09 Jun 26 | 10:11:09 | 0.0003 | 07 Mar 26 | 17:30:05 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 09 Jun 26 | 10:19:11 | 6.4485 | 08 Jun 26 | 15:40:12 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:04:17 | 0 | 28 May 26 | 13:20:17 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV NEW BUS COUPLER | zUG | OFF | 09 Jun 26 | 10:13:16 | 0 | 07 Jun 26 | 18:45:17 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV BUS COUPLER-III | zUG | OFF | 09 Jun 26 | 10:13:23 | 0 | 05 Jun 26 | 12:46:36 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV BUS COUPLER-I | zUG | OFF | 09 Jun 26 | 10:13:19 | 0 | 20 Feb 26 | 13:45:25 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV AKVN-II | zUG | ON | 02 Jan 26 | 11:55:13 | 0 | 28 Dec 25 | 12:04:14 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV BADODIYA | zUG | ON | 02 Jan 26 | 11:55:17 | 0 | 13 Dec 25 | 14:15:18 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV AKVN-I | zUG | ON | 02 Jan 26 | 11:55:18 | 0 | 06 Dec 25 | 13:29:18 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 02 Jan 26 | 11:55:19 | 0 | 24 Dec 25 | 12:23:20 | 0 |
| Total | | | | | | | | | 564.5915 | | | 0 |
|
|
|
|
|
|
|