MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN CO. LTD.
|
|
|
|
CURRENT LOAD DETAILS OF 33KV FEEDERS COMES UNDER GROUP (Un Grouped)
- SORTED BY
| S/S Name | ssid | alocation | district | Feeder Name | Group | fstatus | Date | Time | Present Load | Switching Date | Switching Time | Load Relief |
| 132KV AJNOD | 285 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:56:06 | 0.0001 | 07 Jul 26 | 04:27:06 | 0 |
| 132KV BETMA | 221 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 01:08:16 | 0 | 16 Oct 26 | 16:19:15 | 0 |
| 132KV CHAMBAL | 93 | D1 | INDORE | 33KV BUS COUPLER-II | zUG | OFF | 05 Nov 26 | 00:54:23 | 0 | 12 Oct 26 | 20:38:18 | 0 |
| 132KV CHAMBAL | 93 | D1 | INDORE | 33KV BUS COUPLER-III | zUG | OFF | 05 Nov 26 | 00:54:24 | 0.0001 | 19 Sep 26 | 16:51:03 | 0 |
| 132KV ELEC_COMPLEX | 270 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:08 | 0.0002 | 17 Oct 26 | 18:37:06 | 0 |
| 132KV GAUTAMPURA | 101 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:15 | 0 | 05 Aug 26 | 14:45:20 | 0 |
| 132KV JAMLI | 129 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:20 | 0.0005 | 19 Oct 26 | 17:10:18 | 0 |
| 132KV NIRANJANPUR | 387 | D1 | INDORE | 33KV BARDARI | zUG | ON | 05 Nov 26 | 00:45:04 | 7.2283 | 16 Oct 26 | 23:17:05 | 0 |
| 132KV NIRANJANPUR | 387 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:47:07 | 0.0003 | 22 Oct 26 | 22:16:05 | 0 |
| 132KV RAU | 259 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:58:16 | 0.0003 | 18 Sep 26 | 16:53:44 | 0 |
| 132KV RAUKHEDI | 268 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:08 | 0.0001 | 10 May 26 | 15:35:09 | 0 |
| 132KV SANWER | 95 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:16 | 0 | 07 Oct 26 | 10:19:18 | 0 |
| 132KV SATYASAI | 99 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 02 Jan 25 | 13:21:13 | 0 | 30 Dec 24 | 18:15:16 | 0 |
| 132KV SHIVNI | 296 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:07 | 0 | 24 Jun 25 | 15:40:08 | 0 |
| 132KV SIMROL | 267 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:07 | 0.0006 | 02 Jun 26 | 14:17:07 | 0 |
| 220KV B_MARDANA | 204 | D1 | INDORE | 33KV BUS COUPLER-I | zUG | OFF | 04 Nov 26 | 13:39:44 | 0 | 27 Sep 26 | 06:14:19 | 0 |
| 220KV B_MARDANA | 204 | D1 | INDORE | 33KV SPARE BAY | zUG | OFF | 04 Nov 26 | 13:39:44 | 0 | 06 Oct 26 | 15:09:18 | 0 |
| 220KV B_MARDANA | 204 | D1 | INDORE | 33KV BUS COUPLER-II | zUG | OFF | 04 Nov 26 | 13:39:44 | 0 | 05 Jul 26 | 07:29:22 | 0 |
| 220KV DEPALPUR | 94 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:17 | 0 | 01 Nov 26 | 18:01:16 | 0 |
| 220KV DEPALPUR | 94 | D1 | INDORE | 33KV SPARE BAY | zUG | OFF | 05 Nov 26 | 00:49:19 | 0 | | | 0 |
| 220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV INTERCON. | zUG | OFF | 05 Nov 26 | 00:48:22 | 0 | 22 Oct 26 | 15:15:23 | 0 |
| 220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV TRF CKT BREAKER | zUG | OFF | 05 Nov 26 | 00:48:23 | 0 | 09 Oct 26 | 17:11:23 | 0 |
| 220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV BUS COUPLER-I | zUG | OFF | 05 Nov 26 | 00:49:24 | 0 | 04 Nov 26 | 10:45:23 | 0 |
| 220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV BUS COUPLER-II | zUG | OFF | 05 Nov 26 | 00:49:25 | 0 | 04 Nov 26 | 10:45:23 | 0 |
| 220KV INDORE_SOUTH | 128 | D1 | INDORE | 132KV CAT-II | zUG | ON | 10 Dec 25 | 06:56:57 | 0 | 09 Feb 25 | 15:29:26 | 0 |
| 220KV INDORE_SOUTH | 128 | D1 | INDORE | 132KV CAT-I | zUG | ON | 26 Sep 26 | 11:52:12 | 0 | 24 Aug 26 | 12:42:26 | 0 |
| 220KV JAITPURA | 100 | D1 | INDORE | 33KV PANTHER-B | zUG | ON | 04 Nov 26 | 23:59:18 | 0 | 27 Oct 26 | 13:30:18 | 0 |
| 220KV JAITPURA | 100 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 04 Nov 26 | 23:59:19 | 0 | 04 Nov 26 | 17:10:19 | 0 |
| 220KV MANGLIYA2 | 322 | D1 | INDORE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:18 | 0 | 30 Oct 26 | 14:46:18 | 0 |
| 132KV AGROD | 344 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:06 | 0.0004 | 29 Oct 26 | 17:22:10 | 0 |
| 132KV BAROTHA | 276 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:14 | 0.002 | 24 May 25 | 13:55:14 | 0 |
| 132KV DEWAS_BNP | 66 | D10 | DEWAS | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:56:13 | 0.0001 | 06 Jun 26 | 18:57:10 | 0 |
| 132KV DEWAS_MSP | 65 | D10 | DEWAS | 33KV BUS COUPLER-I | zUG | OFF | 05 Nov 26 | 00:48:25 | 0.0012 | 18 Sep 26 | 15:17:04 | 0 |
| 132KV DEWAS_MSP | 65 | D10 | DEWAS | 33KV BUS COUPLER-II | zUG | OFF | 05 Nov 26 | 00:48:26 | 0.0005 | 18 Jul 26 | 11:10:31 | 0 |
| 132KV KANNOD | 70 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:09 | 0.0001 | 05 Aug 26 | 14:42:09 | 0 |
| 132KV KHATEGAON | 196 | D10 | DEWAS | 33KV N.V.D.A. | zUG | ON | 31 Aug 26 | 12:57:40 | 0 | 24 Jul 26 | 14:11:21 | 0 |
| 132KV KHATEGAON | 196 | D10 | DEWAS | 33KV HARANGAON | zUG | ON | 31 Aug 26 | 12:57:39 | 0 | 25 Aug 26 | 11:23:18 | 0 |
| 132KV KHATEGAON | 196 | D10 | DEWAS | 33KV KOLARI | zUG | ON | 31 Aug 26 | 12:56:13 | 0 | 27 Aug 26 | 10:30:13 | 0 |
| 132KV KHATEGAON | 196 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 31 Aug 26 | 12:56:15 | 0 | 21 Aug 26 | 12:16:16 | 0 |
| 132KV KISHANGARH | 319 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:06 | 0.0003 | 21 May 26 | 22:09:07 | 0 |
| 132KV SATWAS | 273 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 17 Nov 25 | 21:45:53 | 0 | 06 Sep 25 | 10:52:13 | 0 |
| 132KV SATWAS | 273 | D10 | DEWAS | 33KV PAMAKHEDI L. I. | zUG | ON | 17 Nov 25 | 21:45:53 | 0 | 26 Sep 25 | 15:34:18 | 0 |
| 132KV SHANKARGARH | 295 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 17 Mar 26 | 11:27:14 | 0 | | | 0 |
| 132KV SONKATCH | 71 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:18 | 0.0001 | 01 Nov 26 | 14:57:17 | 0 |
| 220KV CHAPDA | 67 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 04 Jun 26 | 12:42:21 | 0 | 04 Jun 26 | 11:58:20 | 0 |
| 220KV DEWAS | 63 | D10 | DEWAS | 33KV BUS COUPLER | zUG | OFF | 24 Aug 26 | 11:23:19 | 0 | 21 Aug 26 | 14:41:18 | 0 |
| 132KV ARNIYAKALA | 74 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:53:17 | 3.552 | 18 Sep 26 | 11:45:19 | 0 |
| 132KV ARNIYAKALA | 74 | D11 | SHAJAPUR | 33KV KANADIYA | zUG | ON | 05 Nov 26 | 00:53:17 | 2.688 | 29 Sep 26 | 12:04:17 | 0 |
| 132KV BERCHHA | 231 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:13 | 0 | 11 Sep 25 | 15:47:19 | 0 |
| 132KV KALAPIPAL | 299 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:57:17 | 0.0004 | 13 Jun 26 | 21:37:16 | 0 |
| 132KV M_BADODIA | 72 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 13 Feb 25 | 17:52:16 | 0 | 13 Feb 25 | 12:00:17 | 0 |
| 132KV MAXI | 75 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:17 | 0.0005 | 12 Jul 25 | 19:41:15 | 0 |
| 132KV PANWADI | 73 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:16 | 0.0001 | 20 Oct 26 | 21:06:16 | 0 |
| 132KV POLAYKALAN | 241 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 07 Sep 26 | 16:50:15 | 0 | 31 Aug 26 | 16:52:15 | 0 |
| 132KV SHAJAPUR | 68 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 24 Oct 26 | 19:02:29 | 0 | 25 May 26 | 18:15:19 | 0 |
| 132KV SHUJALPUR | 69 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:19 | 0 | 08 Sep 26 | 10:30:18 | 0 |
| 220KV SHAJAPUR2 | 331 | D11 | SHAJAPUR | 33KV KANASIYA | zUG | ON | 05 Nov 26 | 00:53:14 | 9.948 | 03 Nov 26 | 17:00:14 | 0 |
| 220KV SHAJAPUR2 | 331 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:15 | 0 | 17 Oct 26 | 15:50:17 | 0 |
| 220KV SHAJAPUR2 | 331 | D11 | SHAJAPUR | 33KV SPARE BAY | zUG | ON | 05 Nov 26 | 00:53:15 | 0.276 | 04 Nov 26 | 15:50:15 | 0 |
| 220KV SHUJALPUR2 | 64 | D11 | SHAJAPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:48:17 | 0 | 24 Oct 26 | 22:00:21 | 0 |
| 132KV ALOTE | 76 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:19 | 0.0001 | 22 Sep 25 | 07:50:19 | 0 |
| 132KV BHENSOLA | 357 | D12 | RATLAM | 33KV BADAWADA | zUG | ON | 03 Nov 26 | 15:59:08 | 0 | 13 Sep 26 | 15:25:08 | 0 |
| 132KV DHARAD | 318 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:19 | 0.0001 | 01 Jun 26 | 14:36:19 | 0 |
| 132KV RATLAM | 80 | D12 | RATLAM | 33KV NEW BUS COUPLER | zUG | ON | 05 Nov 26 | 00:52:19 | 3.78 | 18 Oct 26 | 23:33:19 | 0 |
| 132KV SAILANA | 89 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 04 Nov 26 | 08:48:18 | 0 | 26 Oct 26 | 14:53:09 | 0 |
| 132KV TAL | 328 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:06 | 0.0001 | 30 May 26 | 06:18:08 | 0 |
| 220KV JAORA | 77 | D12 | RATLAM | 33KV BUS COUPLER-II | zUG | ON | 05 Nov 26 | 00:55:14 | 5.337 | 04 Nov 26 | 06:48:16 | 0 |
| 220KV JAORA | 77 | D12 | RATLAM | 33KV BUS COUPLER-I | zUG | OFF | 05 Nov 26 | 00:55:11 | 0.0006 | 14 Oct 26 | 17:59:12 | 0 |
| 220KV RATLAM2 | 78 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:22 | 0.0002 | 25 Sep 26 | 13:57:21 | 0 |
| 220KV RATLAM2 | 78 | D12 | RATLAM | 33KV NEW FEEDER-1 | zUG | ON | 05 Nov 26 | 00:53:23 | 8.114 | 02 Nov 26 | 16:36:26 | 0 |
| 220KV SAILANA2 | 386 | D12 | RATLAM | 33KV HATNARA | zUG | ON | 05 Nov 26 | 00:54:11 | 7.7653 | 02 Nov 26 | 07:15:07 | 0 |
| 220KV SAILANA2 | 386 | D12 | RATLAM | 33KV MATAJI BADAYLA | zUG | ON | 05 Nov 26 | 00:54:10 | 1.6463 | 01 Nov 26 | 12:36:07 | 0 |
| 220KV SAILANA2 | 386 | D12 | RATLAM | 33KV AYANA | zUG | ON | 05 Nov 26 | 00:54:11 | 0.649 | 04 Nov 26 | 18:11:08 | 0 |
| 220KV SAILANA2 | 386 | D12 | RATLAM | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:09 | 0.0004 | 04 Nov 26 | 18:11:05 | 0 |
| 132KV GAROTH | 87 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | | | | | | | |
| 132KV GAROTH | 87 | D13 | MANDSAUR | 33KV SPARE BAY | zUG | OFF | 13 Oct 26 | 20:42:20 | 0 | 29 Jul 25 | 17:45:55 | 0 |
| 132KV MALHARGARH | 86 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:21 | 0 | 18 Oct 26 | 21:23:20 | 0 |
| 132KV MANDSAUR | 82 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:07 | 0.0002 | 27 Oct 26 | 13:06:07 | 0 |
| 132KV SHAMGARH | 390 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:06 | 0.0002 | 15 Jul 26 | 14:04:11 | 0 |
| 132KV SHAMGARH | 390 | D13 | MANDSAUR | 33KV MELKHEDA | zUG | ON | 05 Nov 26 | 00:52:07 | 2.2331 | 03 Nov 26 | 11:52:07 | 0 |
| 132KV SITAMAU | 263 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:15 | 0 | 30 Oct 26 | 10:34:15 | 0 |
| 132KV SUWASRA | 84 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:38 | 0.0004 | 22 Oct 26 | 13:57:18 | 0 |
| 220KV BHANPURA | 338 | D13 | MANDSAUR | 33KV SPARE BAY | zUG | ON | 05 Nov 26 | 00:55:06 | 2.3586 | 03 Nov 26 | 12:54:06 | 0 |
| 220KV BHANPURA | 338 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:07 | 0 | 28 Oct 26 | 05:31:06 | 0 |
| 220KV DALODA | 85 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:49:16 | 2.28 | 28 Oct 26 | 10:38:16 | 0 |
| 220KV SUWASRA2 | 346 | D13 | MANDSAUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:04 | 0 | 09 Mar 26 | 04:46:06 | 0 |
| 132KV MANASA | 83 | D14 | NEEMUCH | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:15 | 0 | 02 Nov 26 | 18:05:15 | 0 |
| 132KV MORWAN | 391 | D14 | NEEMUCH | 33KV JAWAD | zUG | ON | 05 Nov 26 | 00:53:06 | 1.4028 | 06 Oct 26 | 13:46:06 | 0 |
| 132KV MORWAN | 391 | D14 | NEEMUCH | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:07 | 0.0003 | 06 Nov 25 | 12:44:07 | 0 |
| 132KV NEEMUCH | 81 | D14 | NEEMUCH | 33KV KHETA KHEDA | zUG | ON | 26 Oct 26 | 20:02:16 | 0 | | | 0 |
| 132KV NEEMUCH | 81 | D14 | NEEMUCH | 33KV BUS COUPLER | zUG | OFF | 26 Oct 26 | 20:02:15 | 0 | 02 May 25 | 12:00:16 | 0 |
| 132KV RATANGARH | 88 | D14 | NEEMUCH | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:15 | 0 | | | 0 |
| 220KV NEEMUCH2 | 79 | D14 | NEEMUCH | 33KV BUS COUPLER | zUG | OFF | 04 Nov 26 | 02:10:24 | 0 | 03 Nov 26 | 16:10:19 | 0 |
| 132KV AGAR | 57 | D15 | AGAR | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:54:20 | 0.0004 | 13 Sep 25 | 21:50:19 | 0 |
| 132KV SUSNER | 60 | D15 | AGAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:17 | 0.0002 | 27 Oct 26 | 15:05:17 | 0 |
| 220KV BAROD | 213 | D15 | AGAR | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:51:14 | 0 | 22 Oct 26 | 16:13:14 | 0 |
| 220KV NALKHEDA | 297 | D15 | AGAR | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:55:08 | 0.0001 | 22 Oct 26 | 17:24:07 | 0 |
| 132KV CHHEGAON | 117 | D2 | KHANDWA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:11 | 0.0001 | 13 Aug 26 | 13:53:13 | 0 |
| 132KV KHANDWA | 115 | D2 | KHANDWA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:44 | 0.0006 | 31 May 26 | 05:17:26 | 0 |
| 132KV MOONDI | 258 | D2 | KHANDWA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:47:14 | 0 | 27 Oct 26 | 13:45:15 | 0 |
| 220KV CHANNERA | 215 | D2 | KHANDWA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:18 | 0.0002 | 28 Oct 26 | 14:01:21 | 0 |
| 220KV CHHEGAON2 | 234 | D2 | KHANDWA | 33KV MICRO IRRI. | zUG | ON | 05 Nov 26 | 00:53:18 | 0.0115 | 01 Oct 26 | 14:45:18 | 0 |
| 220KV CHHEGAON2 | 234 | D2 | KHANDWA | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:53:15 | 1.016 | 03 Nov 26 | 11:00:15 | 0 |
| 132KV BAHADARPUR | 121 | D3 | BURHANPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:15 | 0.0007 | 26 Sep 26 | 09:00:13 | 0 |
| 132KV PIPALPANI | 356 | D3 | BURHANPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:07 | 0.0004 | 23 Oct 26 | 15:00:05 | 0 |
| 132KV PIPALPANI | 356 | D3 | BURHANPUR | 33KV SPARE BAY | zUG | OFF | 05 Nov 26 | 00:52:09 | 0.0003 | | | 0 |
| 220KV NEPANAGAR | 118 | D3 | BURHANPUR | 33KV BUS COUPLER | zUG | OFF | 10 Jul 24 | 07:00:17 | 0 | 10 Jun 24 | 02:14:16 | 0 |
| 132KV ANDAD | 329 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:08 | 0.0001 | 26 Sep 26 | 17:08:06 | 0 |
| 132KV BALWADA | 277 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:08 | 0.0005 | 29 May 26 | 17:51:08 | 0 |
| 132KV BALWADA | 277 | D4 | KHARGONE | 132KV NVDA PS-II | zUG | ON | 05 Nov 26 | 00:50:09 | 12.0404 | 02 May 25 | 20:18:09 | 0 |
| 132KV BHIKANGAON | 124 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 30 Nov 24 | 11:00:14 | 0 | 18 Nov 24 | 08:37:14 | 0 |
| 132KV BHIKANGAON | 124 | D4 | KHARGONE | 33KV MEGA ENGG. | zUG | OFF | 30 Nov 24 | 11:00:15 | 0 | 04 Jan 24 | 09:35:19 | 0 |
| 132KV BISTAN | 378 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 04 Nov 26 | 13:55:06 | 0 | 01 Oct 26 | 10:59:08 | 0 |
| 132KV BISTAN | 378 | D4 | KHARGONE | 33KV SARVER DEVLA | zUG | ON | 04 Nov 26 | 13:55:08 | 0 | 01 Oct 26 | 12:37:10 | 0 |
| 132KV CHHOTIKHARGONE | 116 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:15 | 0 | 23 Apr 26 | 11:53:15 | 0 |
| 132KV KASRAWAD | 229 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:18 | 0 | 07 Jul 26 | 11:48:19 | 0 |
| 132KV KHARGONE | 119 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:20 | 0 | 27 Oct 26 | 15:48:20 | 0 |
| 132KV SANAWAD | 126 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:16 | 0 | 23 Aug 26 | 13:10:17 | 0 |
| 132KV TALAKPURA | 337 | D4 | KHARGONE | 33KV NVDA PH-2 | zUG | ON | 05 Nov 26 | 00:53:08 | 0.0076 | 22 Aug 26 | 11:09:09 | 0 |
| 132KV TALAKPURA | 337 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:06 | 0.0003 | 21 Nov 25 | 18:37:10 | 0 |
| 220KV BARWAHA | 114 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 26 Feb 26 | 09:08:20 | 0 | 28 Nov 25 | 15:56:22 | 0 |
| 220KV NIMRANI | 97 | D4 | KHARGONE | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:18 | 0.0005 | 04 Nov 26 | 12:59:19 | 0 |
| 132KV ANJAD | 341 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 04 Nov 26 | 22:41:18 | 0 | 12 Aug 25 | 06:07:16 | 0 |
| 132KV BARWANI | 110 | D5 | BARWANI | 33KV NAVALPURA | zUG | ON | 05 Nov 26 | 00:49:17 | 2.278 | 16 Aug 26 | 15:29:30 | 0 |
| 132KV BARWANI | 110 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:18 | 0 | 16 Jun 25 | 13:12:21 | 0 |
| 132KV PANSEMAL | 120 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:17 | 0.0003 | 28 Jul 26 | 13:30:22 | 0 |
| 132KV PATI | 392 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:05 | 0.0004 | 04 Aug 25 | 01:54:03 | 0 |
| 132KV SENDHWA | 125 | D5 | BARWANI | 33KV SPARE BAY | zUG | OFF | 05 Nov 26 | 00:50:13 | 0.001 | 25 Oct 25 | 05:57:13 | 0 |
| 132KV SENDHWA | 125 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:16 | 0 | 21 Aug 26 | 13:52:16 | 0 |
| 132KV SHAHPURA | 360 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:56:08 | 0.0004 | 16 Jul 26 | 13:21:05 | 0 |
| 220KV JULWANIA | 123 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:13 | 0.0003 | 21 Jul 26 | 20:59:16 | 0 |
| 220KV SENDHWA2 | 359 | D5 | BARWANI | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:54:03 | 0.0004 | 27 Sep 26 | 11:47:05 | 0 |
| 132KV BAGDI | 214 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:15 | 0 | 07 Apr 26 | 11:45:14 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV HEADQUARTER | zUG | ON | 05 Nov 26 | 00:55:03 | 4.8412 | 24 Oct 26 | 11:36:02 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV HANUMANTIYA | zUG | ON | 05 Nov 26 | 00:55:04 | 5.4413 | 20 Oct 26 | 16:21:04 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV NANDLAI | zUG | ON | 05 Nov 26 | 00:55:05 | 6.09 | 30 Sep 26 | 16:24:05 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:06 | 0.0007 | 01 Oct 26 | 12:36:06 | 0 |
| 132KV CHHAYAN | 345 | D6 | DHAR | 33KV TILGARA | zUG | ON | 05 Nov 26 | 00:55:07 | 6.9938 | 12 Oct 26 | 19:19:07 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV N.V.D.A. | zUG | ON | 05 Nov 26 | 00:53:16 | 7.2 | 30 Oct 26 | 15:36:24 | 0 |
| 132KV DHAMNOD | 98 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:17 | 0.002 | 30 Oct 26 | 15:36:25 | 0 |
| 132KV GHATABILLOD | 107 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:50:16 | 0.0003 | 02 Nov 26 | 19:16:18 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 132KV ULTRATECH | zUG | ON | 05 Nov 26 | 00:52:22 | 17.7333 | 11 Sep 25 | 08:12:54 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV SATGURU CEMENTS | zUG | ON | 05 Nov 26 | 00:52:23 | 1.0762 | 20 Sep 25 | 09:43:33 | 0 |
| 132KV MANAWAR | 109 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:21 | 0.0004 | 18 Aug 25 | 19:57:22 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:05 | 0 | 13 Mar 25 | 21:14:04 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV S.I.P.-I | zUG | ON | 05 Nov 26 | 00:51:06 | 11.2155 | 18 Jul 26 | 20:46:06 | 0 |
| 132KV NETRIP | 389 | D6 | DHAR | 33KV S.I.P.-II | zUG | ON | 05 Nov 26 | 00:51:07 | 17.6098 | 28 Apr 26 | 13:53:09 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BOLA | zUG | ON | 05 Nov 26 | 00:55:18 | 6.718 | 20 Oct 26 | 07:08:18 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BHANGARH | zUG | ON | 05 Nov 26 | 00:55:19 | 7.2854 | 27 Oct 26 | 10:59:41 | 0 |
| 132KV RAJGARH | 105 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:55:17 | 0 | 22 Jul 26 | 03:02:16 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV GANDHWANI | zUG | ON | 05 Nov 26 | 00:50:06 | 6.6125 | 15 Oct 26 | 17:16:09 | 0 |
| 132KV SINGHANA | 339 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:06 | 0.0008 | 14 Aug 26 | 12:42:07 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV TEESGAON | zUG | ON | 05 Nov 26 | 00:52:03 | 7.362 | 30 Jun 26 | 11:30:07 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:05 | 0.0003 | 23 Oct 26 | 16:30:07 | 0 |
| 132KV TEESGAON | 375 | D6 | DHAR | 33KV BERCHHA | zUG | ON | 05 Nov 26 | 00:52:04 | 4.5226 | 22 Oct 26 | 12:30:06 | 0 |
| 220KV BADNAGAR | 56 | D6 | DHAR | 33KV KACHHIBARODA | zUG | ON | 05 Nov 26 | 00:50:25 | 3.4711 | 29 Oct 26 | 17:24:24 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV BHOJ ASPATAL | zUG | ON | 05 Nov 26 | 00:51:21 | 0.0453 | 26 Sep 26 | 13:58:22 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 132KV VACMET | zUG | ON | 05 Nov 26 | 00:51:20 | 16.3338 | 20 Aug 26 | 06:25:21 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 132KV B/C VACMET | zUG | OFF | 05 Nov 26 | 00:51:20 | 0.0006 | 20 Jun 22 | 15:04:22 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV NEW BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:17 | 0 | 21 Sep 26 | 17:15:17 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:18 | 0 | 02 Oct 26 | 09:30:19 | 0 |
| 220KV DHAR | 103 | D6 | DHAR | 33KV TIRLA | zUG | ON | 05 Nov 26 | 00:51:19 | 4.387 | 17 Oct 26 | 16:55:21 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV NAGDA | zUG | ON | 05 Nov 26 | 00:51:03 | 6.0853 | 13 Aug 26 | 12:45:02 | 0 |
| 220KV KANWAN2 | 376 | D6 | DHAR | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:51:04 | 0.0001 | 01 Jul 26 | 16:27:05 | 0 |
| 220KV KUKSHI | 106 | D6 | DHAR | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:52:12 | 3.4111 | 03 Nov 26 | 21:58:12 | 0 |
| 220KV PITHAMPUR_SEC1 | 104 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:17 | 0 | 03 Nov 26 | 14:36:17 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV NEW BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:19 | 0.0001 | 01 Nov 26 | 08:30:23 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV BUS COUPLER-I | zUG | OFF | 05 Nov 26 | 00:52:24 | 0 | 01 Nov 26 | 08:18:34 | 0 |
| 220KV PITHAMPUR_SEC3 | 102 | D6 | DHAR | 33KV BUS COUPLER-III | zUG | OFF | 05 Nov 26 | 00:52:28 | 0 | 01 Nov 26 | 08:18:37 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV AKVN-II | zUG | ON | 02 Jan 26 | 11:55:13 | 0 | 28 Dec 25 | 12:04:14 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV BADODIYA | zUG | ON | 05 Nov 26 | 00:49:21 | 3.5665 | 03 Nov 26 | 13:29:17 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV AKVN-I | zUG | ON | 05 Nov 26 | 00:49:22 | 10.8424 | 03 Nov 26 | 22:27:20 | 0 |
| 220KV RAJGARH2 | 112 | D6 | DHAR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:49:23 | 0.0001 | 03 Nov 26 | 16:22:18 | 0 |
| 132KV MEGHNAGAR | 108 | D7 | JHABUA | 33KV KAKANWANI | zUG | ON | 05 Nov 26 | 00:53:17 | 3.8452 | 01 Nov 26 | 15:31:20 | 0 |
| 132KV MEGHNAGAR | 108 | D7 | JHABUA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:16 | 0 | 20 Jul 26 | 16:46:16 | 0 |
| 132KV PETLAWAD | 230 | D7 | JHABUA | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:16 | 0 | 01 Aug 26 | 17:09:16 | 0 |
| 132KV PETLAWAD | 230 | D7 | JHABUA | 33KV TEMRIYA | zUG | ON | 05 Nov 26 | 00:50:17 | 2.871 | 28 Oct 26 | 12:56:16 | 0 |
| 132KV ALIRAJPUR | 113 | D8 | ALIRAJPUR | 132KV LIFT IRR. | zUG | ON | 28 Oct 26 | 11:45:27 | 0 | 02 Apr 26 | 19:43:24 | 0 |
| 132KV ALIRAJPUR | 113 | D8 | ALIRAJPUR | 33KV BUS COUPLER | zUG | OFF | 28 Oct 26 | 11:45:25 | 0 | 13 May 26 | 08:43:18 | 0 |
| 132KV JOBAT | 335 | D8 | ALIRAJPUR | 33KV DABRI | zUG | ON | 05 Nov 26 | 00:52:05 | 1.6676 | 01 Oct 26 | 11:23:05 | 0 |
| 132KV JOBAT | 335 | D8 | ALIRAJPUR | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:06 | 0.0002 | 23 May 26 | 17:46:06 | 0 |
| 132KV BHENSOLA | 357 | D9 | UJJAIN | 33KV BATLAWADI | zUG | ON | 03 Nov 26 | 15:59:04 | 0 | 29 Sep 26 | 15:22:04 | 0 |
| 132KV BHENSOLA | 357 | D9 | UJJAIN | 33KV GHINODA | zUG | ON | 03 Nov 26 | 15:59:05 | 0 | 13 Sep 26 | 15:25:05 | 0 |
| 132KV BHENSOLA | 357 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 03 Nov 26 | 15:59:06 | 0 | 16 Jun 25 | 12:39:06 | 0 |
| 132KV BHERUGARH | 294 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:13 | 0.0012 | 02 Nov 26 | 00:08:13 | 0 |
| 132KV GHONSLA | 212 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 26 Dec 25 | 05:44:16 | 0 | 05 Mar 25 | 10:49:16 | 0 |
| 132KV INGORIA | 58 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:50:16 | 0 | 20 Oct 26 | 12:34:17 | 0 |
| 132KV KHACHROD | 193 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:19 | 0.0001 | 12 Jun 26 | 16:24:18 | 0 |
| 132KV KHACHROD | 193 | D9 | UJJAIN | 33KV AKVN-I | zUG | OFF | 05 Nov 26 | 00:51:22 | 0 | 07 Jan 25 | 21:38:19 | 0 |
| 132KV KHACHROD | 193 | D9 | UJJAIN | 33KV AKVN-II | zUG | OFF | 05 Nov 26 | 00:51:23 | 0.0004 | 28 Aug 25 | 19:37:25 | 0 |
| 132KV KHACHROD | 193 | D9 | UJJAIN | 33KV BUS TIE | zUG | ON | 05 Nov 26 | 00:51:26 | 13.8619 | 27 Sep 25 | 10:00:29 | 0 |
| 132KV KHACHROD | 193 | D9 | UJJAIN | 33KV NEW BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:51:25 | 0.0001 | 27 Jul 26 | 13:48:25 | 0 |
| 132KV MAHIDPUR | 59 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 31 Oct 26 | 13:37:18 | 0 | 23 Oct 26 | 22:34:18 | 0 |
| 132KV MAHIDPUR | 59 | D9 | UJJAIN | 33KV RUDRAKHEDA | zUG | ON | 05 Nov 26 | 00:52:20 | 11.2893 | 29 Oct 26 | 06:21:19 | 0 |
| 132KV MAKDON | 235 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 29 Oct 26 | 20:45:16 | 0 | 25 Aug 26 | 09:48:15 | 0 |
| 132KV RATADIYA | 61 | D9 | UJJAIN | 33KV TRANSFER BAY | zUG | | | | | | | |
| 132KV TARANA | 62 | D9 | UJJAIN | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:49:16 | 0.0006 | 14 Jul 26 | 12:59:17 | 0 |
| 132KV UJJAIN | 55 | D9 | UJJAIN | 33KV TRANSFER BAY | zUG | OFF | 05 Nov 26 | 00:53:18 | 0.0002 | 16 Oct 26 | 15:06:17 | 0 |
| 132KV UJJAIN | 55 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:24 | 0 | 23 Sep 26 | 16:29:23 | 0 |
| 132KV UNHEL | 388 | D9 | UJJAIN | 33KV UNHEL | zUG | ON | 05 Nov 26 | 00:52:13 | 5.352 | 08 Sep 26 | 14:00:13 | 0 |
| 132KV UNHEL | 388 | D9 | UJJAIN | 33KV CHIROLA | zUG | ON | 05 Nov 26 | 00:52:13 | 4.356 | 24 Oct 26 | 07:29:12 | 0 |
| 132KV UNHEL | 388 | D9 | UJJAIN | 33KV SUWASA | zUG | ON | 05 Nov 26 | 00:52:14 | 2.688 | 03 Nov 26 | 12:41:14 | 0 |
| 132KV UNHEL | 388 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:15 | 0 | 01 May 26 | 11:23:17 | 0 |
| 132KV VIK_UDYOGPURI | 379 | D9 | UJJAIN | 33KV NEW MADHOPUR | zUG | ON | 05 Nov 26 | 00:53:02 | 5.0623 | 10 Oct 26 | 15:07:03 | 0 |
| 132KV VIK_UDYOGPURI | 379 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:53:04 | 0.0001 | 11 Jul 26 | 03:12:07 | 0 |
| 132KV ZARDA | 228 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | OFF | 05 Nov 26 | 00:52:20 | 0 | 22 Jul 26 | 17:00:16 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 5 MVA | zUG | ON | 05 Nov 26 | 00:50:19 | 1.4326 | 23 Feb 25 | 10:55:21 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 8 MVA | zUG | ON | 05 Nov 26 | 00:50:20 | 0.912 | 14 Oct 26 | 08:15:20 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 33KV BUS COUPLER-I | zUG | OFF | 05 Nov 26 | 00:50:23 | 0.001 | 14 Oct 26 | 15:32:22 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 33KV HT | zUG | ON | 05 Nov 26 | 00:50:21 | 2.7909 | 04 Nov 26 | 13:59:21 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 33KV KHEDAWADA | zUG | ON | 05 Nov 26 | 00:50:22 | 10.0544 | 29 Oct 26 | 14:11:22 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 33KV PIPLU | zUG | ON | 05 Nov 26 | 00:50:23 | 5.7481 | 15 Oct 26 | 06:12:23 | 0 |
| 220KV BADNAGAR | 56 | D9 | UJJAIN | 33KV BUS COUPLER-II | zUG | OFF | 06 Mar 25 | 17:55:37 | 0 | 15 Feb 25 | 13:00:27 | 0 |
| 220KV NAGDA | 91 | D9 | UJJAIN | 132KV GRASIM | zUG | ON | 26 Jun 26 | 02:06:21 | 0 | 05 Jun 26 | 05:51:21 | 0 |
| 220KV NAGDA | 91 | D9 | UJJAIN | 33KV BUS COUPLER | zUG | ON | 05 Nov 26 | 00:51:18 | 8.52 | 30 Oct 26 | 12:25:25 | 0 |
| 220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV TRANSFER BAY-II | zUG | OFF | 05 Nov 26 | 00:51:05 | 0 | 28 Oct 26 | 14:56:04 | 0 |
| 220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV TRANSFER BAY-I | zUG | OFF | 05 Nov 26 | 00:51:11 | 0.0001 | 28 Oct 26 | 14:56:11 | 0 |
| Total | | | | | | | | | 313.9344 | | | 0 |
|
|
|
|
|
|
|