CURRENT LOAD DETAILS OF 33KV FEEDERS COMES UNDER GROUP (Un Grouped) - SORTED BY

S/S NamessidalocationdistrictFeeder NameGroupfstatusDateTimePresent LoadSwitching DateSwitching TimeLoad Relief
132KV AJNOD285D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:36:070.000718 Feb 2605:11:050
132KV BETMA221D1INDORE33KV BUS COUPLERzUGOFF08 May 2620:26:15005 Mar 2617:15:150
132KV CHAMBAL93D1INDORE33KV BUS COUPLER-IIzUGOFF08 May 2619:19:17003 Apr 2612:15:170
132KV CHAMBAL93D1INDORE33KV BUS COUPLER-IIIzUGOFF08 May 2619:19:18018 Sep 2517:22:170
132KV ELEC_COMPLEX270D1INDORE33KV BUS COUPLERzUGOFF24 Mar 2613:40:05001 Sep 2500:15:080
132KV GAUTAMPURA101D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:13:15029 Jan 2616:45:140
132KV JAMLI129D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:24:180.000112 Apr 2617:28:190
132KV NIRANJANPUR387D1INDORE33KV BARDARIzUGON08 May 2619:11:047.97802 May 2603:48:050
132KV NIRANJANPUR387D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:11:050.000108 May 2604:37:050
132KV RAU259D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:21:170.000305 Nov 2516:08:160
132KV RAUKHEDI268D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:28:080.000306 Mar 2612:01:090
132KV SANWER95D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:37:16031 Oct 2512:37:170
132KV SATYASAI99D1INDORE33KV BUS COUPLERzUGOFF02 Jan 2513:21:13030 Dec 2418:15:160
132KV SHIVNI296D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:41:080.000124 Jun 2515:40:080
132KV SIMROL267D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:23:090.000121 Apr 2612:40:080
220KV B_MARDANA204D1INDORE33KV BUS COUPLER-IzUGOFF08 May 2619:34:14009 Jan 2513:59:150
220KV B_MARDANA204D1INDORE33KV SPARE BAYzUGOFF08 May 2619:34:150.000501 Apr 2614:45:150
220KV B_MARDANA204D1INDORE33KV BUS COUPLER-IIzUGOFF08 May 2619:34:210.000413 Mar 2608:09:210
220KV DEPALPUR94D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:34:17005 Mar 2610:39:170
220KV DEPALPUR94D1INDORE33KV SPARE BAYzUGOFF08 May 2619:34:190  0
220KV INDORE_NORTH92D1INDORE33KV INTERCON.zUGOFF08 May 2619:14:25026 Dec 2512:14:190
220KV INDORE_NORTH92D1INDORE33KV TRF CKT BREAKERzUGOFF08 May 2619:14:27017 Jan 2615:00:210
220KV INDORE_SOUTH128D1INDORE132KV CAT-IzUGON01 May 2621:47:24020 Oct 2509:32:240
220KV INDORE_SOUTH128D1INDORE33KV BUS COUPLER-IzUGOFF27 Apr 2616:02:35025 Feb 2610:15:380
220KV INDORE_SOUTH128D1INDORE33KV BUS COUPLER-IIzUGON27 Apr 2616:02:35021 Feb 2616:51:260
220KV INDORE_SOUTH128D1INDORE132KV CAT-IIzUGON10 Dec 2506:56:57009 Feb 2515:29:260
220KV JAITPURA100D1INDORE33KV PANTHER-BzUGON08 May 2619:18:193.47226 Apr 2607:10:190
220KV JAITPURA100D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:18:200.000608 May 2616:47:190
220KV MANGLIYA2322D1INDORE33KV BUS COUPLERzUGOFF08 May 2619:30:17027 Apr 2618:33:170
132KV AGROD344D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:32:060.000604 May 2610:58:100
132KV BAROTHA276D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:34:150.00624 May 2513:55:140
132KV DEWAS_BNP66D10DEWAS33KV TRANSFER BAYzUGOFF08 May 2619:23:140.000207 Apr 2617:38:110
132KV DEWAS_MSP65D10DEWAS33KV BUS COUPLER-IzUGOFF08 May 2619:12:260.000306 Sep 2513:45:260
132KV DEWAS_MSP65D10DEWAS33KV BUS COUPLER-IIzUGOFF08 May 2619:12:270.000213 Apr 2613:54:340
132KV KANNOD70D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:19:100.000221 Aug 2514:46:250
132KV KHATEGAON196D10DEWAS33KV N.V.D.A.zUGON08 May 2619:12:220.044804 May 2621:15:190
132KV KHATEGAON196D10DEWAS33KV HARANGAONzUGON08 May 2619:12:212.604411 Apr 2603:01:180
132KV KHATEGAON196D10DEWAS33KV KOLARIzUGON08 May 2619:12:142.88820 Apr 2608:11:130
132KV KHATEGAON196D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:12:16003 May 2610:30:160
132KV KISHANGARH319D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:25:060.000223 Apr 2621:28:170
132KV MAXI75D10DEWAS33KV AALRIzUGON05 May 2609:40:12004 May 2619:58:130
132KV SATWAS273D10DEWAS33KV PAMAKHEDI L. I.zUGON17 Nov 2521:45:53026 Sep 2515:34:180
132KV SATWAS273D10DEWAS33KV BUS COUPLERzUGOFF17 Nov 2521:45:53006 Sep 2510:52:130
132KV SHANKARGARH295D10DEWAS33KV BUS COUPLERzUGOFF17 Mar 2611:27:140  0
132KV SONKATCH71D10DEWAS33KV BUS COUPLERzUGOFF18 Oct 2504:15:18026 Jul 2417:00:170
220KV CHAPDA67D10DEWAS33KV N.V.D.A.zUGON08 May 2619:27:210.035120 Nov 2514:19:210
220KV CHAPDA67D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:27:20027 Oct 2513:00:220
220KV DEWAS63D10DEWAS33KV BUS COUPLERzUGOFF08 May 2619:31:19017 Apr 2615:16:180
132KV ARNIYAKALA74D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:31:16003 Apr 2611:57:180
132KV ARNIYAKALA74D11SHAJAPUR33KV KANADIYAzUGON08 May 2619:31:161.0804 May 2620:08:190
132KV BERCHHA231D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:21:14011 Sep 2515:47:190
132KV KALAPIPAL299D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:20:160.000303 Sep 2514:29:170
132KV M_BADODIA72D11SHAJAPUR33KV BUS COUPLERzUGOFF13 Feb 2517:52:16013 Feb 2512:00:170
132KV MAXI75D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:21:180.000512 Jul 2519:41:150
132KV PANWADI73D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:21:160.000115 Apr 2611:41:160
132KV POLAYKALAN241D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:21:16002 Jan 2614:43:150
132KV SHAJAPUR68D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:06:20027 Mar 2614:08:200
132KV SHUJALPUR69D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:28:18010 Nov 2516:46:180
220KV SHAJAPUR2331D11SHAJAPUR33KV KANASIYAzUGOFF08 May 2619:23:13007 Apr 2610:28:130
220KV SHAJAPUR2331D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:23:140.003309 Oct 2413:47:150
220KV SHAJAPUR2331D11SHAJAPUR33KV SPARE BAYzUGOFF08 May 2619:23:140  0
220KV SHUJALPUR264D11SHAJAPUR33KV BUS COUPLERzUGOFF08 May 2619:19:16001 Aug 2406:45:170
132KV ALOTE76D12RATLAM33KV BUS COUPLERzUGOFF22 Apr 2607:07:24022 Sep 2507:50:190
132KV BHENSOLA357D12RATLAM33KV BADAWADAzUGON08 May 2619:28:082.722926 Sep 2515:56:080
132KV DHARAD318D12RATLAM33KV BUS COUPLERzUGON08 May 2619:20:153.06922 Jan 2619:31:370
132KV RATLAM80D12RATLAM33KV NEW BUS COUPLERzUGOFF08 May 2619:25:19004 May 2607:42:200
132KV SAILANA89D12RATLAM33KV BUS COUPLERzUGON06 Mar 2609:11:18009 Jan 2615:48:170
132KV TAL328D12RATLAM33KV BUS COUPLERzUGOFF08 May 2619:21:090.000121 Jan 2616:23:060
220KV JAORA77D12RATLAM33KV BUS COUPLER-IIzUGOFF07 May 2621:50:15004 Apr 2619:03:150
220KV JAORA77D12RATLAM33KV BUS COUPLER-IzUGON07 May 2621:48:12006 May 2606:18:120
220KV RATLAM278D12RATLAM33KV BUS COUPLERzUGOFF08 Mar 2614:34:24007 Feb 2616:46:210
220KV RATLAM278D12RATLAM33KV NEW FEEDER-1zUGON08 Mar 2614:34:25006 Mar 2612:34:230
220KV SAILANA2386D12RATLAM33KV HATNARAzUGON08 May 2619:22:081.680403 May 2615:37:090
220KV SAILANA2386D12RATLAM33KV MATAJI BADAYLAzUGON08 May 2619:22:070.546406 May 2608:12:060
220KV SAILANA2386D12RATLAM33KV BUS COUPLERzUGOFF08 May 2619:22:060.000317 Feb 2616:06:070
132KV GAROTH87D13MANDSAUR33KV BUS COUPLERzUG       
132KV GAROTH87D13MANDSAUR33KV SPARE BAYzUGOFF24 Feb 2612:15:20029 Jul 2517:45:550
132KV MALHARGARH86D13MANDSAUR33KV BUS COUPLERzUGOFF08 May 2619:37:230.000105 Apr 2611:45:210
132KV MANDSAUR82D13MANDSAUR33KV BUS COUPLERzUGOFF28 Apr 2614:09:06027 Mar 2611:49:070
132KV SHAMGARH390D13MANDSAUR33KV BUS COUPLERzUGOFF08 May 2619:38:050.000129 Mar 2515:38:040
132KV SITAMAU263D13MANDSAUR33KV BUS COUPLERzUGOFF04 Mar 2614:10:18009 Nov 2510:53:150
132KV SUWASRA84D13MANDSAUR33KV BUS COUPLERzUGOFF07 May 2615:36:18003 Apr 2610:33:180
220KV BHANPURA338D13MANDSAUR33KV SPARE BAYzUGOFF08 May 2619:21:060.000628 Feb 2514:21:070
220KV BHANPURA338D13MANDSAUR33KV BUS COUPLERzUGOFF08 May 2619:21:070.000308 May 2609:00:080
220KV DALODA85D13MANDSAUR33KV BUS COUPLERzUGON29 Apr 2618:51:32006 Nov 2522:23:220
220KV SUWASRA2346D13MANDSAUR33KV BUS COUPLERzUGOFF08 May 2619:44:040.000109 Mar 2604:46:060
132KV MANASA83D14NEEMUCH33KV BUS COUPLERzUGOFF08 May 2619:00:17006 Nov 2516:30:150
132KV MORWAN391D14NEEMUCH33KV JAWADzUGOFF07 Nov 2514:52:05013 Aug 2505:31:070
132KV MORWAN391D14NEEMUCH33KV BUS COUPLERzUGOFF07 Nov 2514:52:06006 Nov 2512:44:070
132KV NEEMUCH81D14NEEMUCH33KV BUS COUPLERzUGOFF07 May 2511:15:14002 May 2512:00:160
132KV RATANGARH88D14NEEMUCH33KV BUS COUPLERzUGOFF07 Apr 2616:50:150  0
220KV NEEMUCH279D14NEEMUCH33KV BUS COUPLERzUGOFF27 Jul 2421:49:19026 Jul 2412:01:190
132KV AGAR57D15AGAR33KV TRANSFER BAYzUGOFF08 May 2619:20:200.000113 Sep 2521:50:190
132KV SUSNER60D15AGAR33KV BUS COUPLERzUGOFF08 May 2619:35:170.000305 May 2611:48:170
220KV BAROD213D15AGAR33KV TRANSFER BAYzUGOFF08 May 2619:24:19013 Mar 2615:38:140
220KV NALKHEDA297D15AGAR33KV TRANSFER BAYzUGOFF08 May 2619:20:060.000407 May 2615:35:080
132KV CHHEGAON117D2KHANDWA33KV MALWA-IIzUGON08 May 2618:53:111.863229 Apr 2613:22:110
132KV CHHEGAON117D2KHANDWA33KV BUS COUPLERzUGOFF08 May 2618:53:130.000809 Dec 2511:18:120
132KV KHANDWA115D2KHANDWA33KV BUS COUPLERzUGOFF08 May 2619:25:260.000103 Apr 2611:36:250
132KV MOONDI258D2KHANDWA33KV BUS COUPLERzUGOFF13 Mar 2619:26:14029 Aug 2518:16:150
132KV PANDHANA336D2KHANDWA33KV RDSS BAY-IzUGON08 May 2619:25:071.98829 Mar 2616:00:080
220KV CHANNERA215D2KHANDWA33KV BUS COUPLERzUGOFF08 Dec 2511:09:17022 Nov 2514:19:160
220KV CHANNERA215D2KHANDWA33KV SPARE BAYzUGOFF08 Dec 2511:09:15023 Jul 2506:12:160
220KV CHHEGAON2234D2KHANDWA33KV MICRO IRRI.zUGON08 May 2619:24:180.000101 May 2613:12:170
220KV CHHEGAON2234D2KHANDWA33KV BUS COUPLERzUGON08 May 2619:24:150.4505 May 2613:00:140
132KV BAHADARPUR121D3BURHANPUR33KV BUS COUPLERzUGOFF08 May 2619:29:140.000912 Sep 2514:32:130
132KV PIPALPANI356D3BURHANPUR33KV BUS COUPLERzUGOFF08 May 2619:25:050.000415 Apr 2611:45:050
132KV PIPALPANI356D3BURHANPUR33KV SPARE BAYzUGOFF08 May 2619:25:070.0004  0
220KV NEPANAGAR118D3BURHANPUR33KV BUS COUPLERzUGOFF10 Jul 2407:00:17010 Jun 2402:14:160
132KV ANDAD329D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:36:07004 Aug 2513:46:060
132KV BALWADA277D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:11:070.000702 Sep 2511:35:080
132KV BALWADA277D4KHARGONE132KV NVDA PS-IIzUGON08 May 2619:11:070.048802 May 2520:18:090
132KV BHIKANGAON124D4KHARGONE33KV BUS COUPLERzUGOFF30 Nov 2411:00:14018 Nov 2408:37:140
132KV BHIKANGAON124D4KHARGONE33KV MEGA ENGG.zUGOFF30 Nov 2411:00:15004 Jan 2409:35:190
132KV BISTAN378D4KHARGONE33KV BUS COUPLERzUG       
132KV CHHOTIKHARGONE116D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:13:15023 Apr 2611:53:150
132KV KASRAWAD229D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2612:19:17029 Mar 2623:54:160
132KV KHARGONE119D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:21:19011 Dec 2517:00:240
132KV SANAWAD126D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:23:16003 Nov 2514:45:170
132KV TALAKPURA337D4KHARGONE33KV NVDA PH-2zUGON08 May 2619:43:080.011523 Feb 2610:23:080
132KV TALAKPURA337D4KHARGONE33KV BUS COUPLERzUGOFF08 May 2619:43:060.000321 Nov 2518:37:100
220KV BARWAHA114D4KHARGONE33KV BUS COUPLERzUGOFF26 Feb 2609:08:20028 Nov 2515:56:220
220KV NIMRANI97D4KHARGONE33KV BUS COUPLERzUGOFF03 May 2618:24:18022 Apr 2616:04:170
132KV ANJAD341D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:42:16012 Aug 2506:07:160
132KV BARWANI110D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:10:210.00216 Jun 2513:12:210
132KV PANSEMAL120D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:26:200.000103 Apr 2612:34:190
132KV PATI392D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:42:060.000204 Aug 2501:54:030
132KV SENDHWA125D5BARWANI33KV SPARE BAYzUGOFF08 May 2619:14:130.000125 Oct 2505:57:130
132KV SENDHWA125D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:14:16008 Apr 2612:34:150
132KV SHAHPURA360D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:48:050.000516 Oct 2516:11:050
220KV JULWANIA123D5BARWANI33KV BUS COUPLERzUGON08 May 2619:16:172.97605 May 2610:34:170
220KV SENDHWA2359D5BARWANI33KV BUS COUPLERzUGOFF08 May 2619:42:040.000325 Jul 2515:04:030
132KV BAGDI214D6DHAR33KV BUS COUPLERzUGOFF08 May 2611:40:15007 Apr 2611:45:140
132KV CHHAYAN345D6DHAR33KV HEADQUARTERzUGON08 May 2619:27:042.546103 Apr 2613:30:030
132KV CHHAYAN345D6DHAR33KV HANUMANTIYAzUGON08 May 2619:27:054.864704 Jan 2605:02:040
132KV CHHAYAN345D6DHAR33KV NANDLAIzUGON08 May 2619:27:062.167622 Apr 2617:21:060
132KV CHHAYAN345D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:27:07025 Sep 2510:41:050
132KV CHHAYAN345D6DHAR33KV TILGARAzUGON08 May 2619:27:083.686902 Apr 2623:22:130
132KV DHAMNOD98D6DHAR33KV N.V.D.A.zUGON08 May 2619:37:172.23220 Apr 2600:31:150
132KV DHAMNOD98D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:37:18019 Sep 2512:57:160
132KV GHATABILLOD107D6DHAR33KV BUS COUPLERzUGON08 May 2619:17:160.000629 Mar 2610:30:160
132KV MANAWAR109D6DHAR132KV ULTRATECHzUGON08 May 2619:26:2411.362611 Sep 2508:12:540
132KV MANAWAR109D6DHAR33KV SATGURU CEMENTSzUGON08 May 2619:26:255.757520 Sep 2509:43:330
132KV MANAWAR109D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:26:230.000518 Aug 2519:57:220
132KV NETRIP389D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:25:060.000413 Mar 2521:14:040
132KV NETRIP389D6DHAR33KV S.I.P.-IzUGON08 May 2619:25:0613.745212 Jan 2609:22:060
132KV NETRIP389D6DHAR33KV S.I.P.-IIzUGON08 May 2619:25:0713.698828 Apr 2613:53:090
132KV RAJGARH105D6DHAR33KV BOLAzUGON06 Apr 2610:56:18027 Oct 2518:15:180
132KV RAJGARH105D6DHAR33KV BHANGARHzUGON06 Apr 2610:56:19013 Dec 2507:40:180
132KV RAJGARH105D6DHAR33KV BUS COUPLERzUGON06 Apr 2610:56:17013 Dec 2510:34:170
132KV SINGHANA339D6DHAR33KV GANDHWANIzUGON08 May 2619:17:064.931221 Apr 2611:17:060
132KV SINGHANA339D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:17:070.001226 Apr 2616:22:060
132KV TEESGAON375D6DHAR33KV TEESGAONzUGON08 May 2619:26:053.893718 Apr 2617:22:030
132KV TEESGAON375D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:26:070.000112 Dec 2513:55:060
132KV TEESGAON375D6DHAR33KV BERCHHAzUGON08 May 2619:26:062.312904 May 2620:48:050
220KV BADNAGAR56D6DHAR33KV KACHHIBARODAzUGON08 May 2619:30:250.980125 Apr 2616:19:250
220KV DHAR103D6DHAR33KV BHOJ ASPATALzUGON06 May 2617:42:22003 Nov 2511:57:220
220KV DHAR103D6DHAR132KV VACMETzUGON06 May 2617:42:21015 Sep 2502:47:210
220KV DHAR103D6DHAR132KV B/C VACMETzUGOFF06 May 2617:42:22020 Jun 2215:04:220
220KV DHAR103D6DHAR33KV NEW BUS COUPLERzUGOFF06 May 2617:42:18005 Apr 2612:42:180
220KV DHAR103D6DHAR33KV BUS COUPLERzUGOFF06 May 2617:42:19024 Apr 2608:29:180
220KV DHAR103D6DHAR33KV TIRLAzUGON06 May 2617:42:20031 Mar 2612:05:190
220KV KANWAN2376D6DHAR33KV NAGDAzUGON08 May 2619:24:054.743406 May 2607:05:020
220KV KANWAN2376D6DHAR33KV TRANSFER BAYzUGOFF08 May 2619:24:060.000307 Mar 2617:30:050
220KV KUKSHI106D6DHAR33KV BUS COUPLERzUGON08 May 2619:32:121.242407 May 2615:34:120
220KV PITHAMPUR_SEC1104D6DHAR33KV BUS COUPLERzUGOFF08 May 2619:18:17001 May 2616:15:160
220KV PITHAMPUR_SEC3102D6DHAR33KV NEW BUS COUPLERzUGOFF08 May 2619:26:160.000527 Feb 2617:24:200
220KV PITHAMPUR_SEC3102D6DHAR33KV BUS COUPLER-IzUGOFF08 May 2619:26:19020 Feb 2613:45:250
220KV PITHAMPUR_SEC3102D6DHAR33KV BUS COUPLER-IIIzUGOFF08 May 2619:26:23004 May 2613:30:270
220KV RAJGARH2112D6DHAR33KV AKVN-IIzUGON02 Jan 2611:55:13028 Dec 2512:04:140
220KV RAJGARH2112D6DHAR33KV BADODIYAzUGON02 Jan 2611:55:17013 Dec 2514:15:180
220KV RAJGARH2112D6DHAR33KV AKVN-IzUGON02 Jan 2611:55:18006 Dec 2513:29:180
220KV RAJGARH2112D6DHAR33KV BUS COUPLERzUGOFF02 Jan 2611:55:19024 Dec 2512:23:200
132KV MEGHNAGAR108D7JHABUA33KV KAKANWANIzUGON08 May 2619:25:173.532406 May 2622:15:170
132KV MEGHNAGAR108D7JHABUA33KV BUS COUPLERzUGOFF08 May 2619:25:16014 Dec 2512:49:150
132KV PETLAWAD230D7JHABUA33KV BUS COUPLERzUGON05 Feb 2614:52:17005 Nov 2514:48:190
132KV PETLAWAD230D7JHABUA33KV TEMRIYAzUGON05 Feb 2610:51:23024 Sep 2518:15:190
132KV ALIRAJPUR113D8ALIRAJPUR132KV LIFT IRR.zUGON08 May 2619:23:210.063802 Apr 2619:43:240
132KV ALIRAJPUR113D8ALIRAJPUR33KV BUS COUPLERzUGON08 May 2619:23:195.873702 May 2605:41:180
132KV JOBAT335D8ALIRAJPUR33KV DABRIzUGON08 May 2619:24:051.619216 Apr 2611:55:060
132KV JOBAT335D8ALIRAJPUR33KV BUS COUPLERzUGOFF08 May 2619:24:060.000517 Apr 2621:56:080
132KV BHENSOLA357D9UJJAIN33KV BATLAWADIzUGON08 May 2619:28:042.758327 Sep 2516:31:060
132KV BHENSOLA357D9UJJAIN33KV GHINODAzUGON08 May 2619:28:052.573602 Apr 2622:04:040
132KV BHENSOLA357D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:28:060.000116 Jun 2512:39:060
132KV GHONSLA212D9UJJAIN33KV BUS COUPLERzUGOFF26 Dec 2505:44:16005 Mar 2510:49:160
132KV INGORIA58D9UJJAIN33KV BUS COUPLERzUGOFF17 Mar 2601:00:21019 Sep 2507:30:170
132KV KHACHROD193D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:18:180.000121 Jun 2505:14:180
132KV KHACHROD193D9UJJAIN33KV AKVN-IzUGOFF08 May 2619:18:220.000207 Jan 2521:38:190
132KV KHACHROD193D9UJJAIN33KV AKVN-IIzUGOFF08 May 2619:18:230.000428 Aug 2519:37:250
132KV KHACHROD193D9UJJAIN33KV BUS TIEzUGON08 May 2619:18:266.673427 Sep 2510:00:290
132KV KHACHROD193D9UJJAIN33KV NEW BUS COUPLERzUGOFF08 May 2619:18:250.000324 Sep 2511:08:250
132KV MAHIDPUR59D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:27:17012 Jan 2611:49:160
132KV MAHIDPUR59D9UJJAIN33KV RUDRAKHEDAzUGON08 May 2619:27:192.817717 Apr 2613:19:180
132KV MAKDON235D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:33:15004 Feb 2614:32:140
132KV RATADIYA61D9UJJAIN33KV TRANSFER BAYzUG       
132KV TARANA62D9UJJAIN33KV TRANSFER BAYzUGOFF08 May 2619:19:200.000513 Feb 2615:53:250
132KV UJJAIN55D9UJJAIN33KV TRANSFER BAYzUGOFF08 May 2619:38:170.000120 Feb 2611:50:170
132KV UJJAIN55D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:38:240.000220 Oct 2511:30:230
132KV UNHEL388D9UJJAIN33KV UNHELzUGON04 May 2608:59:15002 Feb 2617:16:130
132KV UNHEL388D9UJJAIN33KV CHIROLAzUGON08 May 2619:39:12015 Apr 2610:32:120
132KV UNHEL388D9UJJAIN33KV SUWASAzUGON08 May 2619:39:133.08420 Apr 2619:23:150
132KV UNHEL388D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:39:17001 May 2611:23:170
132KV VIK_UDYOGPURI379D9UJJAIN33KV VIK_UDYOGPURI-3zUGON08 May 2619:49:074.947306 May 2615:05:070
132KV VIK_UDYOGPURI379D9UJJAIN33KV NEW MADHOPURzUGON08 May 2619:49:038.456125 Apr 2614:27:030
132KV VIK_UDYOGPURI379D9UJJAIN33KV VIK_UDYOGPURI-1zUGON08 May 2619:49:040.203122 Apr 2612:59:320
132KV VIK_UDYOGPURI379D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:49:050.000101 Apr 2609:34:110
132KV ZARDA228D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:27:14016 Sep 2517:00:140
220KV BADNAGAR56D9UJJAIN33KV HTzUGON08 May 2619:30:215.642823 Apr 2619:59:240
220KV BADNAGAR56D9UJJAIN33KV KHEDAWADAzUGOFF08 May 2619:30:220.000108 May 2612:50:260
220KV BADNAGAR56D9UJJAIN33KV PIPLUzUGON08 May 2619:30:231.823531 Mar 2620:26:220
220KV BADNAGAR56D9UJJAIN33KV BUS COUPLER-IIzUGOFF06 Mar 2517:55:37015 Feb 2513:00:270
220KV BADNAGAR56D9UJJAIN5 MVAzUGON07 Mar 2511:34:20023 Feb 2510:55:210
220KV BADNAGAR56D9UJJAIN8 MVAzUGON08 May 2619:30:200.00631 Mar 2620:28:190
220KV BADNAGAR56D9UJJAIN33KV BUS COUPLER-IzUGON08 May 2619:30:244.095526 Apr 2617:45:230
220KV NAGDA91D9UJJAIN132KV GRASIMzUGON06 Feb 2618:51:20027 Sep 2516:47:210
220KV NAGDA91D9UJJAIN33KV BUS COUPLERzUGOFF08 May 2619:31:18007 May 2617:14:190
220KV UJJAIN254D9UJJAIN33KV TRANSFER BAY-IIzUGON08 May 2619:28:045.537608 May 2614:47:100
220KV UJJAIN254D9UJJAIN33KV TRANSFER BAY-IzUGOFF08 May 2619:28:110.000108 Apr 2617:44:120
Total        171.3623  0