MADHYA PRADESH PASCHIM KSHETRA VIDYUT VITARAN CO. LTD.
|
|
|
CURRENT LOAD DETAILS OF 33KV FEEDERS COMES UNDER GROUP (VIII)
- SORTED BY
S/S Name | ssid | alocation | district | Feeder Name | Group | fstatus | Date | Time | Present Load | Switching Date | Switching Time | Load Relief |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV RAJMOHALLA-II | VIII | ON | 19 Apr 24 | 17:29:17 | 14.2928 | 15 Apr 24 | 18:16:12 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV RAJMOHALLA-I | VIII | ON | 19 Apr 24 | 17:29:18 | 5.5242 | 19 Apr 24 | 14:14:14 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MP NAGAR-II | VIII | ON | 19 Apr 24 | 17:29:19 | 6.2453 | 19 Apr 24 | 07:07:15 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV GAMBHIR | VIII | ON | 19 Apr 24 | 17:29:19 | 4.864 | 19 Apr 24 | 07:06:15 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MALTI | VIII | OFF | 19 Apr 24 | 17:29:20 | 0 | 18 Apr 24 | 19:40:15 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV GANDHI HALL-I | VIII | ON | 19 Apr 24 | 17:29:22 | 13.669 | 19 Apr 24 | 07:05:25 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV GANDHI HALL-II | VIII | ON | 19 Apr 24 | 17:29:22 | 7.278 | 19 Apr 24 | 07:08:23 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MP NAGAR-I | VIII | ON | 19 Apr 24 | 17:29:24 | 2.4008 | 18 Mar 24 | 11:45:35 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MANORAMAGANJ-II | VIII | ON | 19 Apr 24 | 17:29:26 | 9.11 | 19 Apr 24 | 07:08:25 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV CITY-II | VIII | ON | 19 Apr 24 | 17:29:27 | 7.7645 | 19 Apr 24 | 07:08:26 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV CITY-I | VIII | ON | 19 Apr 24 | 17:29:28 | 1.4708 | 19 Apr 24 | 16:24:24 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV INDORE STEEL | VIII | ON | 19 Apr 24 | 17:29:28 | 1.204 | 19 Apr 24 | 07:31:23 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MANORAMAGANJ-I | VIII | OFF | 19 Apr 24 | 17:29:29 | 0.002 | 08 Apr 24 | 06:52:24 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MILL | VIII | ON | 19 Apr 24 | 17:29:29 | 9.106 | 09 Apr 24 | 11:36:25 | 0 |
132KV CHAMBAL | 93 | D1 | INDORE | 33KV MILK DAIRY | VIII | ON | 19 Apr 24 | 17:29:30 | 7.5 | 19 Apr 24 | 09:32:36 | 0 |
132KV ELEC_COMPLEX | 270 | D1 | INDORE | 33KV E.S.I.-I | VIII | ON | 19 Apr 24 | 17:32:09 | 12.5459 | 12 Apr 24 | 19:59:04 | 0 |
132KV ELEC_COMPLEX | 270 | D1 | INDORE | 33KV E. C. ZONE | VIII | ON | 19 Apr 24 | 17:32:10 | 5.2994 | 19 Apr 24 | 09:35:05 | 0 |
132KV ELEC_COMPLEX | 270 | D1 | INDORE | 33KV KHATIPURA | VIII | ON | 19 Apr 24 | 17:32:11 | 2.7473 | 17 Apr 24 | 00:46:12 | 0 |
132KV ELEC_COMPLEX | 270 | D1 | INDORE | 33KV E.S.I.-II | VIII | ON | 19 Apr 24 | 17:31:09 | 9.2734 | 17 Apr 24 | 06:09:07 | 0 |
132KV JAMLI | 129 | D1 | INDORE | 33KV MHOW | VIII | ON | 19 Apr 24 | 17:36:14 | 9.132 | 19 Apr 24 | 04:58:13 | 0 |
132KV NAVDAPANTH | 194 | D1 | INDORE | 33KV NAGIN NAGAR-1 | VIII | ON | 05 Feb 24 | 10:43:13 | 0 | 03 Feb 24 | 11:20:20 | 0 |
132KV NAVDAPANTH | 194 | D1 | INDORE | 33KV NAGIN NAGAR-2 | VIII | ON | 19 Apr 24 | 17:33:13 | 11.224 | 19 Apr 24 | 14:18:16 | 0 |
132KV NAVDAPANTH | 194 | D1 | INDORE | 33KV GANDHI NAGAR | VIII | ON | 19 Apr 24 | 17:33:14 | 5.136 | 14 Apr 24 | 14:06:13 | 0 |
132KV NIRANJANPUR | 387 | D1 | INDORE | 33KV JHAKHYABITA | VIII | ON | 19 Apr 24 | 17:18:04 | 5.8161 | 17 Apr 24 | 21:35:03 | 0 |
132KV RAU | 259 | D1 | INDORE | 33KV MHOW | VIII | ON | 19 Apr 24 | 17:35:13 | 5.136 | 18 Apr 24 | 06:43:13 | 0 |
132KV RAU | 259 | D1 | INDORE | 33KV PANTHER-1 | VIII | ON | 19 Apr 24 | 17:35:14 | 4.9579 | 16 Apr 24 | 21:33:14 | 0 |
132KV RAU | 259 | D1 | INDORE | 33KV SILICON CITY | VIII | ON | 19 Apr 24 | 17:35:15 | 7.9025 | 16 Apr 24 | 21:06:15 | 0 |
132KV RAU | 259 | D1 | INDORE | 33KV PANTHER-2 | VIII | ON | 19 Apr 24 | 17:35:17 | 0.6904 | 16 Apr 24 | 21:33:17 | 0 |
132KV RAU | 259 | D1 | INDORE | 33KV HARIFATAK | VIII | ON | 19 Apr 24 | 17:35:19 | 3.1619 | 18 Apr 24 | 08:07:19 | 0 |
132KV RAUKHEDI | 268 | D1 | INDORE | 33KV DLF-1 | VIII | ON | 19 Apr 24 | 17:39:06 | 0.402 | 12 Apr 24 | 20:14:06 | 0 |
132KV RAUKHEDI | 268 | D1 | INDORE | 33KV DLF-2 | VIII | ON | 19 Apr 24 | 17:39:07 | 0.6863 | 12 Apr 24 | 07:36:05 | 0 |
132KV RAUKHEDI | 268 | D1 | INDORE | 33KV EXP. PANTHER-3 | VIII | ON | 19 Apr 24 | 17:39:08 | 2.5136 | 17 Apr 24 | 14:32:07 | 0 |
132KV RAUKHEDI | 268 | D1 | INDORE | 33KV EXP. PANTHER-4 | VIII | ON | 19 Apr 24 | 17:39:09 | 8.7213 | 17 Apr 24 | 15:26:10 | 0 |
132KV SATYASAI | 99 | D1 | INDORE | 33KV VANDANA NAGAR | VIII | ON | 19 Apr 24 | 16:01:13 | 12.6 | 12 Apr 24 | 20:40:12 | 0 |
132KV SATYASAI | 99 | D1 | INDORE | 33KV SATYASAI | VIII | ON | 19 Apr 24 | 16:01:14 | 8.772 | 19 Apr 24 | 01:57:16 | 0 |
132KV SATYASAI | 99 | D1 | INDORE | 33KV TULSI NAGAR | VIII | ON | 19 Apr 24 | 16:01:15 | 15.144 | 16 Apr 24 | 16:09:14 | 0 |
132KV SATYASAI | 99 | D1 | INDORE | 33KV PRESS COMPLEX | VIII | ON | 19 Apr 24 | 16:01:15 | 12.42 | 18 Apr 24 | 07:40:14 | 0 |
220KV B_MARDANA | 204 | D1 | INDORE | 33KV VANDANA NGR.-II | VIII | ON | 19 Apr 24 | 17:23:14 | 12.766 | 17 Apr 24 | 16:11:14 | 0 |
220KV B_MARDANA | 204 | D1 | INDORE | 33KV VANDANA NGR.-I | VIII | ON | 19 Apr 24 | 17:23:14 | 6.948 | 16 Feb 24 | 09:47:13 | 0 |
220KV B_MARDANA | 204 | D1 | INDORE | 33KV SANCHAR NGR.-II | VIII | ON | 19 Apr 24 | 17:23:15 | 4.356 | 19 Apr 24 | 09:19:15 | 0 |
220KV B_MARDANA | 204 | D1 | INDORE | 33KV SANCHAR NGR.-I | VIII | ON | 19 Apr 24 | 17:23:15 | 11.934 | 12 Apr 24 | 21:03:14 | 0 |
220KV B_MARDANA | 204 | D1 | INDORE | 33KV SCHEME NO. 140 | VIII | ON | 19 Apr 24 | 17:23:18 | 9.048 | 19 Apr 24 | 16:37:16 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV VIJAY NAGAR-I | VIII | ON | 19 Apr 24 | 14:12:12 | 9.468 | 14 Apr 24 | 19:31:13 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV SANGAM NAGAR-II | VIII | ON | 19 Apr 24 | 17:15:19 | 7.9216 | 19 Apr 24 | 06:50:17 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV SANGAM NAGAR-I | VIII | ON | 19 Apr 24 | 17:15:21 | 6.9704 | 19 Apr 24 | 06:50:19 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV SANGAM NAGAR-III | VIII | ON | 19 Apr 24 | 17:15:22 | 0.3752 | 19 Apr 24 | 06:21:20 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV MANGLIYA | VIII | ON | 19 Apr 24 | 17:15:23 | 0.9704 | 12 Apr 24 | 20:23:18 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV SANGAM NAGAR-IV | VIII | OFF | 19 Apr 24 | 17:15:24 | 0 | 18 Apr 24 | 19:39:21 | 0 |
220KV INDORE_NORTH | 92 | D1 | INDORE | 33KV VIJAY NAGAR-II | VIII | ON | 19 Apr 24 | 17:15:26 | 0.436 | 18 Apr 24 | 16:21:26 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV SABJI MANDI | VIII | ON | 19 Apr 24 | 17:22:12 | 10.992 | 13 Apr 24 | 12:20:16 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV RAU | VIII | ON | 19 Apr 24 | 17:22:12 | 6.42 | 14 Apr 24 | 12:02:12 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV RAJENDRA NAGAR | VIII | ON | 19 Apr 24 | 17:22:13 | 8.58 | 14 Apr 24 | 13:56:13 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV PAGNISPAGA | VIII | ON | 19 Apr 24 | 17:22:13 | 11.664 | 17 Apr 24 | 08:04:13 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV NAVLAKHA-I | VIII | ON | 19 Apr 24 | 17:22:14 | 5.016 | 17 Apr 24 | 14:21:14 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV NAVLAKHA-II | VIII | ON | 19 Apr 24 | 17:22:14 | 6.192 | 13 Apr 24 | 00:03:15 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV PITHAMPUR | VIII | ON | 19 Apr 24 | 17:22:15 | 0.276 | 15 Apr 24 | 07:27:16 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV DALY COLLEGE-I | VIII | ON | 19 Apr 24 | 17:22:15 | 11.1199 | 14 Apr 24 | 07:57:15 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV DALY COLLEGE-II | VIII | ON | 19 Apr 24 | 17:22:16 | 9.984 | 15 Apr 24 | 18:13:16 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV INDIRA COMP.-I | VIII | ON | 19 Apr 24 | 17:22:18 | 12.54 | 18 Apr 24 | 16:47:19 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV INDIRA COMP.-II | VIII | ON | 19 Apr 24 | 17:22:18 | 10.188 | 18 Apr 24 | 16:47:19 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV KAMPEL | VIII | ON | 19 Apr 24 | 17:22:19 | 9.192 | 19 Apr 24 | 08:39:49 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV ASRAWAD | VIII | ON | 19 Apr 24 | 17:22:19 | 1.764 | 19 Apr 24 | 08:41:25 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV KASTURBAGRAM | VIII | ON | 19 Apr 24 | 17:22:20 | 0.168 | 19 Apr 24 | 14:45:21 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV BIJALPUR-I | VIII | ON | 19 Apr 24 | 17:22:21 | 8.712 | 19 Apr 24 | 03:45:23 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV BIJALPUR-II | VIII | ON | 19 Apr 24 | 17:22:21 | 10.86 | 16 Apr 24 | 21:12:22 | 0 |
220KV INDORE_SOUTH | 128 | D1 | INDORE | 33KV KANADIYA | VIII | ON | 19 Apr 24 | 17:22:22 | 7.104 | 15 Apr 24 | 16:02:23 | 0 |
220KV JAITPURA | 100 | D1 | INDORE | 33KV PANTHER-A | VIII | ON | 19 Apr 24 | 17:21:16 | 2.0506 | 10 Apr 24 | 16:56:13 | 0 |
220KV MANGLIYA2 | 322 | D1 | INDORE | 33KV BOMBAY HOSPITAL | VIII | ON | 19 Apr 24 | 17:27:14 | 0.6833 | 15 Apr 24 | 18:00:13 | 0 |
220KV MANGLIYA2 | 322 | D1 | INDORE | 33KV MANGLIYA | VIII | ON | 19 Apr 24 | 17:27:15 | 8.892 | 18 Apr 24 | 06:08:14 | 0 |
132KV DEWAS_BNP | 66 | D10 | DEWAS | 33KV BNP-I | VIII | ON | 19 Apr 24 | 17:18:09 | 1.6229 | 06 Apr 24 | 06:07:09 | 0 |
132KV DEWAS_BNP | 66 | D10 | DEWAS | 33KV BNP-II | VIII | OFF | 19 Apr 24 | 17:18:10 | 0.0001 | | | 0 |
132KV BHERUGARH | 294 | D9 | UJJAIN | 33KV SIDDHAWAT | VIII | ON | 19 Apr 24 | 17:28:08 | 6.876 | 14 Apr 24 | 12:23:07 | 0 |
132KV BHERUGARH | 294 | D9 | UJJAIN | 33KV GARHKALIKA-III | VIII | ON | 19 Apr 24 | 17:28:09 | 0.0013 | 14 Apr 24 | 12:23:08 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV VALLABH NAGAR | VIII | ON | 19 Apr 24 | 14:13:16 | 6.414 | 17 Apr 24 | 17:36:16 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV KARTIK MELA-II | VIII | ON | 19 Apr 24 | 14:13:18 | 2.06 | 18 Apr 24 | 17:47:21 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV KARTIK MELA-I | VIII | ON | 19 Apr 24 | 14:13:19 | 2.652 | 19 Apr 24 | 12:51:19 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV DATT AKHADA-III | VIII | ON | 19 Apr 24 | 14:13:14 | 3.612 | 11 Apr 24 | 17:12:15 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV DATT AKHADA-I | VIII | ON | 19 Apr 24 | 14:13:15 | 0.444 | 16 Apr 24 | 17:52:14 | 0 |
132KV RATADIYA | 61 | D9 | UJJAIN | 33KV DATT AKHADA-II | VIII | ON | 19 Apr 24 | 14:13:16 | 2.352 | 17 Apr 24 | 05:47:16 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV INTERCON.-I | VIII | ON | 19 Apr 24 | 17:23:14 | 4.8976 | 05 Mar 24 | 16:48:14 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV JYOTI NAGAR-I | VIII | ON | 19 Apr 24 | 17:23:16 | 4.272 | 19 Apr 24 | 01:32:16 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV JYOTI NAGAR-II | VIII | ON | 19 Apr 24 | 17:23:18 | 1.1716 | 12 Apr 24 | 22:59:17 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV SIGHASTHA | VIII | ON | 19 Apr 24 | 17:23:19 | 2.3522 | 12 Apr 24 | 17:28:19 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV MAXI ROAD | VIII | ON | 19 Apr 24 | 17:23:20 | 3.2987 | 17 Apr 24 | 13:28:21 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV WATER WORKS | VIII | ON | 19 Apr 24 | 17:23:21 | 9.0841 | 16 Apr 24 | 18:07:21 | 0 |
132KV UJJAIN | 55 | D9 | UJJAIN | 33KV VIKRAM KIRTI | VIII | ON | 19 Apr 24 | 17:23:22 | 8.8576 | 19 Apr 24 | 11:44:22 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV MAHASHWETA-II | VIII | ON | 19 Apr 24 | 17:26:04 | 4.3924 | 13 Apr 24 | 14:26:03 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV I.O.C.L. | VIII | ON | 19 Apr 24 | 17:26:07 | 0.4702 | 12 Apr 24 | 12:13:05 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV INTERCON.-II | VIII | ON | 19 Apr 24 | 17:26:10 | 4.9305 | 13 Apr 24 | 11:33:09 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV KSHIPRA VIHAR | VIII | ON | 19 Apr 24 | 17:26:11 | 4.4837 | 19 Apr 24 | 13:43:11 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV MAHASHWETA-I | VIII | ON | 19 Apr 24 | 17:26:15 | 0.0101 | 19 Apr 24 | 16:36:14 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV INTERCON.-I | VIII | ON | 19 Apr 24 | 17:26:15 | 0.001 | 19 Apr 24 | 11:30:19 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV GARHKALIKA-II | VIII | ON | 19 Apr 24 | 17:26:18 | 5.1367 | 19 Apr 24 | 07:43:17 | 0 |
220KV UJJAIN2 | 54 | D9 | UJJAIN | 33KV GARHKALIKA-I | VIII | ON | 19 Apr 24 | 17:26:18 | 0.018 | 19 Apr 24 | 13:43:19 | 0 |
Total | | | | | | | | | 527.7155 | | | 0 |
|
|
|
|
|
|